Whirlpool New Expansion

Project Length
15 weeks

Design and Project Intent

To create accurate drawings for construction workers.
Screenshot (229).png
pngtree-measuring-icon-for-your-project-png-image_1904972.jpg
download.png
Blueprint-icon-by-rudezstudio-1-580x386.jpg

first drawing : stair redesign                    

Screenshot (40).png
Screenshot (53).png

drawing to life

Screenshot (52).png
20230615_080013.jpg

second drawing : fire suppression system                    

Screenshot (48).png
20230615_080958.jpg

third drawing : overhead hanging columns                    

All Pillars.png
20230721_154936.jpg

forth drawing : production layout                   

Final TubeRoom.png

fifth drawing : production line layout                   

Screenshot (157).png